Velox Rapid Edge™ is a product that removes the need for tonns of concrete being set underground as a foundation to fix the edging to. The removal of the concrete saves 56'000kg per 500l/m of traditional edging. This in turn saves around 45 tonn of Co2 emissions from the creation of the concrete.